Scroll the strip below. 7511 Bingham Drive is currently at stage 03, framing complete, sheetrock not yet up.
Pad prep, utility stub outs, and temporary power before anything is poured.
Post tension slab poured and cured to spec before framing begins.
2x6 exterior walls, roof structure, and hip framing for the low pitch roof.
Plumbing, HVAC, and electrical rough-in behind the open stud walls.
Wall and attic insulation installed and inspected ahead of drywall.
Sheetrock hung, taped, floated, and textured through every room.
Rift white oak cabinetry, trim, and the stair and millwork package set.
Stone, stucco, fixtures, and the final walk before closing.
Buyers who come in while a house is framed can still change finish selections, confirm cabinet layouts against the stud walls in person, and see exactly how the stone and stucco will meet the roofline before either goes on.